Assurance of Durable Concrete Structures Using Novel Testing Technologies Developed at QUB

 

By ensuring the durability of notable concrete structures in China, such as the Bird’s Nest National Stadium Beijing, Dayawan Nuclear Power Station, Harbin-Dalian Railway Bridges, Qingdao Bay Bridge and Beijing-Tianjin Railway Bridges using Autoclam Permeability System and Permit Ion Migration test, developed by Queen's University Belfast (QUB) and sold by a QUB spinout Amphora Non-destructive Testing Ltd., the savings in future repair costs are estimated to be hundreds of millions of Chinese Yuan (RMB) (the repair expenditure for the three-year period 2009-'11 was RMB 10.2 billion).

Research on permeability and diffusivity testing of concrete on site since 1993 has led to the incorporation of both the Autoclam and the Permit in a corporation standard issued by the Central Research Institute of Building and Construction (CRIBC), China and the test protocol of Permit in a Chinese railway standard.

The training of construction professionals (including more than 200 senior managers from the Chinese construction industry) since 2008 has impacted on improved sales of Autoclam Permeability System and Permit Ion Migration Test, securing around £500k commercial income, and generating new employment in the UK. Since 2008 these test instruments have been sold to 12 countries.

Permit Ion Migration Test  Qingdao Bay Bridge

In the Qingdao Bay Bridge, the quality assurance of concrete was investigated by Permit Ion Migration Test developed by Queen’s University

Qingdao is the longest bridge over water in the world

 